This project is currently under construction and will connect Mill Lane to the loop trail at Depot Park with an asphalt trail and a pedestrian bridge over Towne Branch. Construction is expected to be completed by Fall 2020. The project is funded under the Transportation Alternatives grand by VDOT which provides 80% project funds with a 20% match from the Town.